Latest news, major events, and key developments shaping countries and regions around the world.
Brasília — The Brazilian federal government has formalized the release of 3 billion reais (approximately US$600 million) for the construction of the Salvador–Itaparica Island Bridge in the state of Bahia, a landmark infrastructure project set to become the longest sea crossing in Latin America. The commitment term was signed on October 13, 2026, in Brasília by Governor Jerônimo Rodrigues during a meeting with representatives of the state and federal governments, including Chief of Staff Minister Miriam Belchior and Transport Minister George Santoro. The funds will be allocated through the New Growth Acceleration Program (Novo PAC) to cover part of the public contributions planned in the public-private partnership responsible for implementing the Salvador–Itaparica Island Bridge Road System.
The agreement establishes mechanisms for planning, monitoring, and accountability for the use of funds, in accordance with the work plan and disbursement schedule. The project, with an estimated total investment of 11.6 billion reais, includes infrastructure, execution of works, operational systems, and other contractually planned investments. In addition to the 3 billion reais from the federal government, the financing structure includes 3.1 billion reais from the Bahia state government and 5.5 billion reais from the private sector. The signing ceremony was attended by senators Jaques Wagner and Otto Alencar, as well as state secretaries Eracy Lafuente and Saulo Pontes.
The bridge, approximately 12.4 kilometers in length over the Bay of All Saints, is part of the West Road System and is expected to directly benefit 250 municipalities and approximately 10 million people. Upon completion, the crossing between Salvador and Itaparica Island, which currently takes about one hour by ferry, will be reduced to just 15 minutes. The project will also enable a reduction of up to 200 kilometers in cargo transport routes, consolidate the Salvador Metropolitan Ring Road, strengthen connections between the main highway corridors of the Bahia state capital, and increase the efficiency of regional mobility.
The initiative represents a significant shift in the region's transportation infrastructure, addressing a long-standing bottleneck that has constrained economic integration between the metropolitan region of Salvador and the southern coastal areas of Bahia. The project includes complementary interventions in Salvador, with 4.4 kilometers of road structures including viaducts and tunnels in the Calçada and Água de Meninos regions, as well as a 22-kilometer expressway on Itaparica Island and the duplication of an eight-kilometer section of BA-001 between Tairu and Ponte do Funil. These integrated improvements are designed to create a seamless transportation corridor that links the capital to the island and beyond.
Read: Global Emergency Preparedness: 35 Countries And Entities Issue High Alerts Including UK And Singapore
The construction is being carried out under a 35-year public-private partnership contract signed between the government of Bahia and the Salvador–Itaparica Bridge Concessionaire, a consortium comprised of Chinese companies China Railway Bureau Group and China Communications Construction Company. The concession period includes the initial phase for studies and obtaining licenses, five years for construction, and 29 years for operating the system, which will include toll collection. The execution is under the responsibility of Concessionária Dois de Julho, formed by Chinese companies China Civil Engineering Construction Corporation and China Communications Construction Company. This arrangement reflects a broader trend of Chinese infrastructure investment in Latin America, where Chinese contractors have already built power transmission, port, and telecommunications projects.
Construction activities are proceeding simultaneously on land and at sea, with 15 pilings already driven in the Bay of All Saints for the installation of the bridge's foundation. More than 300 professionals are currently working across three construction sites established for the project. A temporary linear platform will be used to transport workers, equipment, and materials during construction, facilitating operations and reducing dependence on support vessels. The bridge will feature a central cable-stayed span of 682 meters in length and 85 meters in height, making it the largest bridge ever constructed over water in Latin America. Upon completion, approximately 28,000 vehicles are expected to use the new connection daily.
The economic implications of the project extend well beyond improved mobility. The bridge is expected to stimulate tourism development, facilitate the flow of agricultural and industrial production, and open doors for investments in various municipalities across Bahia. The improved accessibility to regions with high tourism potential could drive investments in hospitality, services, and real estate developments, while strengthening the regional economy by benefiting hotels, inns, restaurants, local commerce, and service providers. For Bahia, the project represents a key initiative to decentralize economic activity and invigorate new areas of development, with expected impacts on job creation, tourism, and the broader state economy.
The federal funding commitment was celebrated by state and federal officials as a guarantee of the project's continuity. Senator Jaques Wagner, who announced the signing, stated that the allocation represents a critical milestone for the long-awaited infrastructure project. "It is the guarantee that the process will not stop anymore," Wagner said. "It has gained momentum, and we will see this bridge for the joy of Bahians and tourists who will visit us and be able to travel on a beautiful bridge to reach a beautiful island". Governor Jerônimo Rodrigues emphasized the importance of the partnership between state and federal governments, describing the bridge as a strategic project that will strengthen regional integration, improve mobility, and create new opportunities for employment, income, and development for the population of Bahia.
The project's timeline extends to June 2031, when the bridge is scheduled for inauguration. As construction advances, the Salvador-Itaparica Bridge stands as a testament to the scale of infrastructure investment underway in Brazil under the Novo PAC framework, as well as the deepening economic engagement between Brazil and Chinese construction conglomerates. The successful completion of this trans-bay crossing will not only transform the daily lives of millions of residents in the region but also establish a new benchmark for infrastructure development in Latin America, demonstrating the potential of public-private partnerships to deliver transformative projects in emerging economies.